Rus News Journal

The Vologda railwaymen prepare for winter

For today on the Vologda branch of road practically all is made

Behind solving stations the snow-removing technics is fixed, emergency response centres on struggle against snow are created. About it to the correspondent has told a press - the secretary of Northern railway Lilija Senchenko. For today ways and places for a snow unloading are reconsidered and prepared, the technology of cleaning of snow is developed for the major stations, and also schedules of work of snow-ploughs and mechanisms with instructions of sequence of clearing of snow and ice of stations and station ways are developed.

by November, first, 2006 works on capital and average repair of a way should be finished. Already seven are completely ready to work snow-removing and snegoochistitelnyh cars, operating repair of other cars comes to the end.

Already on 70 - 80 percent are ready to work in winter conditions of the device pnevmoobduvki and electroheating strelochnyh transfers. Preparation of compressor installations, thermal networks, curtains, ventilation is conducted. In a planned order in locomotive and carload depots winter grades of fuel and greasings arrive. At all enterprises delivery of winter overalls has begun.

except the planned works annually spent within the limits of preparation for work in winter conditions, this year before frosts the Vologda railwaymen should have time to erect a new roof on fast of management by station Losta. The roof has been broken by hurricane in August. As it is planned to restore there the hurt heating system.